Wednesday, May 06, 2009

The furnitures....






I found a local furniture maker who designed the dinning table for 10.  and while on that customized furniture, we decided to have a go with the beds.

The dinning set alone, there were 6 people working on it. It still amazes me how inexpensive the labour in the Philippines.

Tuesday, April 21, 2009

The Fountain




According to Fung Suey, a front door directly situated at the road is not favorable. A Filipino-Chinese friend advised us to put a fountain to block the energy coming from front road. 
Together with our architect we designed a two sided fountain with a flowing water on both of the street and inside of the fountain wall. 

The Exterior Walls





We are using texture paint for the walls because we notice imperfection of the walls surface of the houses around us. The architect was more than pleased to do it as it gives him a new idea in painting the walls. 

Texture paint is in the form of powder and mixed with water to produce a mud like paint. it is then whisk like a cake mixture so that the blending is fully mixed and be able to plaster it on the wall. 

Thursday, March 19, 2009

The Kitchen....





I always say that the kitchen is the soul of all houses. Looking back to my childhood, my mother's kitchen was always the place the whole family gathered together enjoying good meals cooked either by my mother or my sisters. The dinning table was at the kitchen (we did not have a separate dinning room) and the moment the food was cooked we all dug in. It was in this place that we had so much fun and love as family. 

Suffice to say, my mother's kitchen was the model in our kitchen. I want to recreate those moments. Cooking and enjoying good food and happy company with friends and family. The difference is that, the Manor's Kitchen is completely filled with the latest gadgets the technology can provide. Our water will come from the tap and not from the dipper.  You can imagine.......

The Front wall and Windows.....








Arayat Manor is getting along. After the roof was laid, everything follows so easily. And Now Arayat Manor really looks like a Manor. Everything is taking shape and we are very much excited to move. But we know best that it is better to wait rather than rushing the finish of the dream house.

The Spa....





The idea of personal Spa came into our mind when Robert told me that he needs a bathtub. Not just an ordinary bathtub but a larger bathtub than the one in our previous address in Alaska. During our search of bigger bathtub, i saw samples of Sauna baths. Thus the idea.  Robert has his bigger bathtub and I have my Spa.

Drilling the Deep well....




Staying overnight with the new neighbors gives other benefits other than saving thousands pesos on hotel room. During the first stay, we discovered that the water coming from the tap on the second floor was weak. After discussion with Roland, Bernie, John and Linda (our new found friends and neighbors) we thought it best to tap earth's bountiful resources and drill our own deep well. 

Tuesday, March 10, 2009

The Roof - finally





Finally, the roof is on, the project was completed today.

One more step in the  process of house building. It begins to feel like home.

Sunday, March 01, 2009

The Latest Photos.....




Unfortunately, the roof is 2 weeks late and due to this lateness, the celling is not done, the water proofing of the bath rooms are not done. Even the installation of sauna was postponed.

However, we do have few photos taken few days ago and we do hope that these will give you some latest development of the houes.

Tuesday, February 17, 2009

The Staircase.....




Things are moving along well in the construction of Arayat Manor. This week is the staircase. Last week i show you the photos of the staircase being outlined and week after my birthday holiday in Hong Kong and Macau, the stairs are erected. 

I have 3 photos in this week. hope you like them...

Friday, February 06, 2009

The Roof







After a long delay, the roof has started today.  the delay was due to the electrical connection. I did not realized how hard to have a new electrical connection. Its a brand new connection and the building is brand new. And yet, the electrical company has to send an inspector and give the go signal to a new connection. It took few days before the inspector came and another few days to have it connected. 

Anyway, the building is now connected to the pole in front of the house temporarily. The welders started to assemble the roof frameworks (the joist). And the roof will be installed while we are off to Hong Kong and Macau for my birthday.

We are nearer tot he completion hehehehehehe  

Monday, January 26, 2009

The Exterior - Four Sides of the House





The house is shaping and this week photos are showing the exterior of the house. I took 4 different sides so that you will be able to visualize the house from the Perspective drawing by the architect. 
Hope you like this week photos.....